Once the upstairs bathroom got framed in, and mechanicals, meaning electrical wiring, plumbing and HVAC, were finished, we had a better idea of what we wanted, and it wasn't exactly how it was done. Joe, from Killeen Plumbing stopped by to move the vanity plumbing onto the adjacent wall. The bathroom will have a pocket door to save space, a 5' vanity on one end, a tub on the opposite end and toilet in the middle. Small, but well appointed.
October 26, 2009
Day 36: Insulation
Once the upstairs bathroom got framed in, and mechanicals, meaning electrical wiring, plumbing and HVAC, were finished, we had a better idea of what we wanted, and it wasn't exactly how it was done. Joe, from Killeen Plumbing stopped by to move the vanity plumbing onto the adjacent wall. The bathroom will have a pocket door to save space, a 5' vanity on one end, a tub on the opposite end and toilet in the middle. Small, but well appointed.