September 14, 2009

Day 5: Finding Footing, Building Foundation

After a beautiful weekend, (still no rain!) the day started with the actual building of the footer forms, in the maze outside the front door. Waiting for the inspection. Think I'll have lunch. The inspection department in Bay was in and out shortly after noon.

The cement company. E.C.I, pulled their truck right up to the edge of the excavation and all that clay held strong. A'bag' was attached to the shoot to direct the flow. The equipment in the foreground on the tri-pod is used to check the levelness of the poured cement.

 

Leveling and checking leveling