The cement company. E.C.I, pulled their truck right up to the edge of the excavation and all that clay held strong. A'bag' was attached to the shoot to direct the flow. The equipment in the foreground on the tri-pod is used to check the levelness of the poured cement.
Leveling and checking leveling
No comments:
Post a Comment